Please be advised that the power washing for the following units is being completed today, July 30.  Painting is scheduled to begin next week, weather permitting.

5 Lexington Drive

7 Lexington Drive

9 Lexington Drive

13 Lexington Drive

Residents in these units should close all windows and move outdoor items away from the unit.

Thank you !